Guides for brands planning production in Egypt
Short, practical answers on quality inspection, minimum orders, timelines and printing, written from how Apparate works on every order.

Answers for brands planning production
AQL inspection for apparel, explained
Final QC follows international quality standards (AQL), agreed with every client. Apparate accepts zero critical defects, AQL 2.5 for major defects and AQL 4.0 for minor defects.
Read the guideMinimum order quantity for clothing manufacturing in Egypt
The minimum order is 100 pieces per color, and capacity reaches 50,000 pieces per month across 50+ specialized production partners.
Read the guideSampling and bulk production timelines for apparel
Plan about 5 working days for an initial sample, about 3 for a pre-production sample, and about 4 weeks for standard bulk production (about 5 in peak season).
Read the guideGarment printing techniques compared
We master every type of printing across different materials, and choose the right technique for each design and fabric.
Read the guideStart with a feasibility review
Share your product, quantity and timeline. An experienced apparel account manager will confirm the manufacturing route and the next step.
Bring your idea to life