Four critical quality gates

Quality built into the timeline

Every order passes four quality gates: sample inspection, first-piece inspection, inline QC at 10–20% of production, and final inspection. Final QC follows AQL standards agreed with every client.

Quality built into the timeline
Four critical quality gates

Quality built into the timeline

QC team experience: 10+ years.

01 · Before production

Sample inspection

The sample is checked against the pattern and the brief: measurements, materials, construction, trims, branding, and finishing.

02 · Start of the line

First-piece inspection

The first piece entering the production line is checked progressively at relevant stages to confirm the approved requirements transfer correctly.

03 · At 10–20% of production

Inline quality control

While production is running, work in progress is tested to detect and fix errors at the earliest stage: recurring defects, measurement variation, construction, and finishing.

04 · On receipt

Final quality inspection

The completed order is checked for workmanship, appearance, quantities, branding, finishing, and packing.

Quality assurance / Final QC

The standard stays visible

Final QC follows international quality standards (AQL), agreed with every client.

acceptance

Critical defects: Zero

Safety or regulatory failures, such as a stray needle or an unsafe sharp component.

acceptance level

Major defects: AQL 2.5

Defects that reduce usability, such as open seams, fabric holes, or broken stitches.

acceptance level

Minor defects: AQL 4.0

Small finishing defects that do not affect use, such as loose threads.

Supporting controls may include

  • Measurement, tolerances, fabric, shade and GSM checks
  • Shrinkage, colorfastness and composition verification
  • Branding placement and needle or metal detection where required
  • Corrective action and reinspection

Production acceptance is based on approved samples and documented inspections.

Questions brands ask us

Frequently asked questions

How long do sampling and bulk production take?

An initial sample takes about 5 working days and a pre-production sample about 3 working days. Standard bulk production takes about 4 weeks, and about 5 weeks in peak season. Bulk timing starts after pre-production approvals and materials are confirmed.

What is your minimum order quantity?

Our minimum order is 100 pieces per color. Final minimums are confirmed in a project-specific feasibility review, because materials, trims and construction can affect them.

Let's build a long-term partnership

Start with a feasibility review

Share your product, quantity and timeline. An experienced apparel account manager will confirm the manufacturing route and the next step.

Bring your idea to life
Start a feasibility review